Contemporary Bespoke Kitchen

Four Walls Project Management was contracted to remove an outdated kitchen for our clients in Berkshire.

We installed 2 sun pipes to increase daylight in a dark end of the room, upgraded the electrical consumer unit to adhere to current regulations as lights and sockets were changed and added to within the new kitchen design. Uplifted the existing ceramic tile flooring, prepared and installed new flooring, supplied and fitted an Oak stable door along with plastering and complete decoration of the room before the new bespoke, contemporary kitchen with copper fittings was installed.